Grid Connection & Transmission
Interconnection queues measure in years. Energised megawatts — not empty shells — pace AI buildout, and new lines take the better part of a decade.
Generation→Queue study→Line + substation→Campus
88
Tightness score ⓘ
#3 of 56
▲ Tightening
Lead time
36–84 mo
Theme 1M
−1.2%% in uptrend
40%Metric to watch
Interconnection queue data, large-load tariffs, and transmission capex plans.
What would prove us wrong
Weakens if queue reforms cut time-to-power below two years at scale.
Interconnect theme performance
Equal-weight · rebased 100 · 1YStocks we track
Who controls this bottleneck
Roles, not recommendations. Delayed prices; local currency.
| Stock | Role | Listing | Last | 1D | 1M | 3M | YTD | Off 52w high | Trend | Next earnings |
|---|---|---|---|---|---|---|---|---|---|---|
| PWR Quanta Services |
Grid construction and craft labour at scale | NYSE US |
$620.7 | −2.27% | −6.3% | −8.7% | +47.2% | −20.9% | 2026-10-29 | |
| MYRG MYR Group |
Transmission and electrical construction | NASDAQ US |
$282.6 | −0.13% | −5.1% | −16.4% | +29.4% | −43.6% | 2026-10-28 | |
| MTZ MasTec |
Power delivery and pipeline construction | NYSE US |
$186.1 | +4.63% | −12.9% | −28.8% | −14.4% | −57.5% | 2026-10-29 | |
| AEP American Electric Power |
765kV transmission and large-load interconnects | NASDAQ US |
$130.2 | +0.67% | +8.7% | +2.2% | +15.5% | −5.4% | 2026-10-28 | |
| NEE NextEra Energy |
Largest generation and transmission developer | NYSE US |
$83.71 | +1.91% | +9.6% | −2.5% | +6.5% | −13.2% | 2026-10-21 |
Recent headlines
Auto-updated- NextEra Signed 16.5 Gigawatts of Federal Power Hubs. Here's How It's Funding These Projects.Yahoo Finance · 3h ago
- Chinese-linked solar developer loses appeal over Texas grid interconnectionUtility Dive · 33h ago
- GE Vernova Falls 6% Despite Beat, Raise and $9B Trench Deal; Vertiv Holdings Soars 13%, Eaton and Quanta Services Tick UpYahoo Finance · 2d ago