ETN Eaton
Electrical content per data-centre MW
Fundamentals from public market data, refreshed daily (2026-10-30 21:21 UTC). Figures in reporting currency.
ETN · price with what management and the data said
Timeline: management commentary, data & earnings
8 events-
8
2026-07-31EarningsBeat / raise
Reported EPS 3.15 vs 3.08 expected (+2.4% surprise).
-
7
2026-05-05EarningsBeat / raise
Reported EPS 2.81 vs 2.73 expected (+2.9% surprise).
-
6
2026-02-03EarningsBeat / raise
Reported EPS 3.33 vs 3.32 expected (+0.3% surprise).
-
5
2025-11-04EarningsBeat / raise
Reported EPS 3.07 vs 3.05 expected (+0.5% surprise).
-
4
2025-08-05EarningsBeat / raise
Reported EPS 2.95 vs 2.92 expected (+0.9% surprise).
-
3
2025-05-02EarningsBeat / raise
Reported EPS 2.72 vs 2.71 expected (+0.6% surprise).
-
2
2025-01-31EarningsBeat / raise
Reported EPS 2.83 vs 2.81 expected (+0.7% surprise).
-
1
2024-10-31EarningsBeat / raise
Reported EPS 2.84 vs 2.81 expected (+1.2% surprise).
Latest headlines
Auto-updated daily- Eaton vs. nVent: Which Electrical Equipment Stock Has an Edge?2026-10-30
- ETN Set to Report Q3 Earnings: Should You Buy, Sell or Hold the Stock?2026-10-30
- What Eaton Bulls Got Right2026-10-29
- Eaton's Aerospace Business Broadens Growth Beyond Electrical2026-10-29
- Ahead of Eaton (ETN) Q3 Earnings: Get Ready With Wall Street Estimates for Key Metrics2026-10-29
- Will AI Power Demand Spark a Blowout Quarter for Eaton (ETN) on Nov. 3?2026-10-29
- Rack Mount UPS - Global Strategic Business Report: Capitalize on the US$2.7B-to-US$4.4B Surge by 2032 as ABB, APC by Schneider Electric, Eaton, and Vertiv Battle for Edge Dominance2026-10-28
Alternative data that moves ETN
Predictions involving ETN
Earnings history
EPS vs expectations| Date | Expected EPS | Reported EPS | Surprise |
|---|---|---|---|
| 2026-07-31 | 3.08 | 3.15 | +2.4% |
| 2026-05-05 | 2.73 | 2.81 | +2.9% |
| 2026-02-03 | 3.32 | 3.33 | +0.3% |
| 2025-11-04 | 3.05 | 3.07 | +0.5% |
| 2025-08-05 | 2.92 | 2.95 | +0.9% |
| 2025-05-02 | 2.71 | 2.72 | +0.6% |
| 2025-01-31 | 2.81 | 2.83 | +0.7% |
| 2024-10-31 | 2.81 | 2.84 | +1.2% |
| 2024-08-01 | 2.61 | 2.73 | +4.5% |
| 2024-04-30 | 2.29 | 2.4 | +4.9% |
| 2024-02-01 | 2.47 | 2.55 | +3.2% |
| 2023-10-31 | 2.34 | 2.47 | +5.7% |
| 2023-08-01 | 2.11 | 2.21 | +4.7% |
| 2023-05-02 | 1.78 | 1.88 | +5.3% |
| 2023-02-08 | 2.05 | 2.06 | +0.6% |
| 2022-11-01 | 2.01 | 2.02 | +0.6% |
| 2022-08-02 | 1.82 | 1.87 | +2.8% |
| 2022-05-03 | 1.6 | 1.62 | +1.4% |
| 2022-02-04 | 1.71 | 1.72 | +0.4% |
| 2021-11-02 | 1.73 | 1.75 | +1.3% |
| 2021-08-03 | 1.57 | 1.72 | +9.2% |
| 2021-05-04 | 1.24 | 1.44 | +15.8% |
| 2021-02-02 | 1.24 | 1.28 | +3.3% |
| 2020-11-03 | 1.05 | 1.18 | +12.9% |
About Eaton
Website ↗Eaton Corporation plc operates as a power management company in the United States, Canada, Latin America, Europe, and the Asia Pacific. It operates through Electrical Americas, Electrical Global, Aerospace, Vehicle, and eMobility segments. The company offers electrical and industrial components, power distribution and assemblies, residential products, single- and three-phase power quality and connectivity products, wiring devices, circuit protection products, utility power distribution products, and power reliability equipment; and hazardous duty electrical equipment, emergency lighting, fire detection, intrinsically safe explosion-proof instrumentation, and structural support systems. It also provides pumps, motors, hydraulic power units, hoses and fittings, and electro-hydraulic pumps; valves, cylinders, electronic controls, electromechanical actuators, sensors, aircraft flap and slat …
Large power transformers are hand-built, need grain-oriented steel and copper, and have years-long lead times. Switchgear followed.
What would prove us wrong. Weakens if lead times shorten sharply as Korean, Indian and Mexican capacity arrives.
Inside the hall, every megawatt needs medium-voltage switchgear, UPS, busway and power distribution. A handful of makers supply most of it and backlogs have grown with AI campuses.
What would prove us wrong. Weakens if electrical-equipment backlogs start shrinking while data-center starts hold up.
Who else supplies this
| Stock | Role | Last | 1D | 1M | YTD | Trend |
|---|---|---|---|---|---|---|
| HUBB Hubbell | Utility and campus electrical products | $422.4 | −3.60% | −9.5% | −4.0% | |
| 6501.T Hitachi | Hitachi Energy transformers and HVDC | ¥5,094.0 | +0.45% | −7.2% | +5.1% | |
| SU.PA Schneider Electric | Switchgear, power and cooling for data centres | €237.5 | −4.08% | −18.8% | +2.7% | |
| ABBN.SW ABB | Electrification, drives and robotics | CHF 70.68 | −3.34% | −11.2% | +21.1% | |
| 267260.KS HD Hyundai Electric | Large power transformers for US utilities | ₩424,500 | −3.63% | −37.7% | −44.7% | |
| 298040.KS Hyosung Heavy Industries | Transformers with US plant | ₩1,809,000 | −5.34% | −35.5% | +1.6% | |
| 010120.KS LS Electric | Switchgear and transformers | ₩149,600 | −5.56% | −27.0% | +63.3% | |
| POWL Powell Industries | Custom switchgear and power-control rooms | $156.3 | −7.25% | −18.0% | +47.2% | |
| VRT Vertiv | Power and liquid-cooling chain for AI racks | $232.5 | −5.46% | −5.5% | +43.6% | |
| LR.PA Legrand | Data-center busway, PDUs and power distribution | €131.0 | −2.67% | −6.3% | +4.6% |
Not investment advice. Prices delayed and in local currency. Quotes in "double quotes" are verbatim as reported by the linked source; other commentary is our paraphrase. Earnings dates are estimates.